City of Miami Gardens Agenda Cover Memo Council Meeting Date: January 12, 2011 Item Type: (Enter X in box) Resolution Ordinance Other X Fiscal Impact: (Enter X in box) Yes No Ordinance
Reading: (Enter X in box) 1st Reading 2nd Reading X Public Hearing: (Enter X in box) Yes No Yes No X Funding Source: Community Development Block Grant (CDBG) Advertising Requirement:
(Enter X in box) Yes No X Contract/P.O. Required: (Enter X in box) Yes No RFP/RFQ/Bid #: N/A X Strategic Plan Related (Enter X in box) Yes No Strategic Plan Priority Area: Enhance Organizational
Bus. & Economic Dev Public Safety Quality of Education Qual. of Life & City Image Communication Strategic Plan Obj./Strategy: (list the specific objective/strategy this item will address)
Goal – 2. Improve City X infrastructure Sponsor Name Danny Crew. City Manager Department: Community Development Short Title: A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF MIAMI GARDENS,
FLORIDA AUTHORIZING THE CITY MANAGER AND CITY ATTORNEY TO TAKE ANY AND ALL STEPS TO TO ACCEPT THE RIGHTOF‐WAYS LOCATED WITHIN THE VISTA VERDE NEIGHBORHOOD DESCRIBED IN EXHIBIT “A” ATTACHED
HERETO FROM THE VISTA VERDE TOWNHOUSE HOMEOWNERS ASSOCIATION, INC.; AUTHORIZING THE ISSUANCE OF A WORK ORDER TO CRAVEN THOMPSON & ASSOCIATES, INC.; PROVIDING FOR THE ADOPTION OF REPRESENTATIONS;
PROVIDING AN EFFECTIVE DATE. Staff Summary: Background In 2007, the Department of Community Development began the Livable Neighborhoods Initiative project. This project consists of comprehensive
infrastructure improvements in three (3) residential neighborhoods deemed by our Public Works Department to be among the worst in the city. The 3 neighborhoods consist of: ITEM K-4)
CONSENT AGENDA RESOLUTION Vista Verde Homeowners Association
1515 NW 167 Street, Building 5 Suite 200 Miami Gardens, Florida 33169 1. Garden Circle 2. Kings Gardens I & II 3. Vista Verde/Miramar Gardens On May 6, 2010, with the successful completion
of the Kings Gardens I & II neighborhood improvements, City Staff held a community meeting with the residents of the Garden Circle, Kings Gardens III and Vista Verde/Miramar Gardens
neighborhoods. At this meeting Staff provided a recap of all of the City’s efforts up to this point, including the various community meetings, the preliminary engineering work, the numerous
mailers containing project information, and most recently the pictures of a completed portion of the project area; all done to encourage those neighborhoods that had not yet conveyed
ownership of the right‐of‐ways to the City to do so. As a result of this meeting, the Board of Directors of the Vista Verde Townhouse Homeowners Association, Inc. held a Special Meeting
on October 18, 2010, where a resolution was passed to convey to the City of Miami Gardens the right‐of‐ways to the neighborhood’s paved streets and cul‐de‐sacs in the Vista Verde Townhouse
Sections A, B and C (as detailed in the attached survey). Current Situation Acceptance of Right‐of‐Ways In order for the City to complete the needed infrastructure improvements in the
Vista Verde neighborhood, it was necessary to have the right‐of‐ways transferred from the Vista Verde Townhouse Homeowners Association, Inc. to the City. A resolution is needed in order
for the City to accept the road conveyance. Engineering & Design In addition to accepting conveyance of the roads, the City must also approve the Scope of Work for Craven and Thompson
Associates, Inc. (CTA). CTA is the professional engineering firm awarded the contract to complete the Livable Neighborhood Projects (via Resolution 2007‐50‐557). Under the proposed Scope
of Work CTA will prepare the necessary construction documents that will be used to solicit construction bids. CTA has been the engineer of record since the inception of the Livable Neighborhoods
Initiative, and is intimately familiar with the overall project scope. It is estimated that the preperation of the contruction documents for the Vista Verde neighborhood will cost $294,000.00
The total project cost is estimated at $1.9M, including engineering and project management costs. The City will use the remaining CDBG Funds allocated for the Livable Neighborhoods Initiative,
along with Disaster Recovery Initiative Grant Funds that are currently under contract with Miami Dade County. The required engineering work is expected to take approximately 6 months,
after which the City will solicit bids for the required construction of the infrastructure. Proposed Action:
1515 NW 167 Street, Building 5 Suite 200 Miami Gardens, Florida 33169 It is recommended that the City Council pass the proposed resolution authorizing the acceptance of the right‐of‐ways
within the Vista Verde Neighborhood as described in the attached survey, and further authorizes the City Manager to issue a work order to Craven Thompson & Associates in the amount of
$294,000. Attachment: Attachment A: Vista Verde Townhouse Homeowners Association Meeting Minutes and Resolution from October 18, 2010 (includes survey of project area) Attachment B:
CTA Scope of Work & Fees Schedule
A-1-1 City of Miami Gardens Scope of Consultant Services Livable Neighborhood Improvements Vista Verde Phase I – Townhouse Homeowners Association CONSULTANT: Craven Thompson & Associates,
Inc. RFQ#: 06-07-008 (CTA Project No. 07-0034) This is a portion of the Second Amendment to the agreement approved by the City of Miami Gardens City Commission between the CITY and CONSULTANT
dated March 1, 2007. A. Background The Livable Neighborhood project originally included improvements to the entire 153 acre Vista Verde development. The City has requested engineering
design and construction observation services for Phase I of Vista Verde as shown on the exhibit below. 1. Vista Verde – Phase I Vista Verde Phase I is approximately 36 acres is generally
located east and west of NW 207th Avenue north of NW 38th Avenue to NW 213th Street. Proposed improvements include Drainage, Paving, Sidewalk, Street Lighting, Landscaping, and Signage.
The scope will be as defined in Amendment 2 for Vista Verde applied to Phase I only. The design time frame will be eight (8) months and anticipated construction schedule is estimated
at six (6) months.
Vista Verde Phase I ‐Vista Verde TownHouse Association Total Area 153 Acres Phase I Area 35.764 Acres Area Percentage 23.38% Construction Cost Estimate Phase I $1,688,555.00 Engineering
& CEI Fee Breakdown Phase I Amendment 2 Design Lump Sum $165,000.00 $608,000.00 Testing Lump Sum $5,000.00 $40,000.00 Test Holes Lump Sum $9,500.00 $30,000.00 Landscaping Lump Sum $10,000.00
$20,500.00 Survey Lump Sum $12,000.00 $45,000.00 Public Relations Lump Sum $2,500.00 $12,000.00 Construction Observation Hourly NTE $90,000.00 $525,000.00 Phase I Fee $294,000.00 $1,280,500.00