Loading...
HomeMy WebLinkAbout2011-157-1550 - Agreement with FDOT City of Miami Gardens Agenda Cover Memo Council Meeting Date: September 28, 2011 Item Type: Resolution Ordinance Other X Fiscal Impact: Yes No Ordinance Reading: 1st Reading 2nd Reading X Public Hearing: Yes No Yes No Funding Source: ARRA Stimulus /Stormwater Funds Advertising Requirement: Yes No X Contract/P.O. Required: Yes No RFP/RFQ/Bid #: X Strategic Plan Related Yes No Strategic Plan Priority Area: Enhance Organizational Bus. & Economic Dev Public Safety Quality of Education Qual. of Life & City Image X Communication Strategic Plan Obj./Strategy: (list the specific objective/strategy this item will address) Enhance overall quality of life for residents 1.Improve Infrastructure X Sponsor Name Dr. Danny O. Crew, City Manager Department: Public Works Short Title: A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF MIAMI GARDENS, FLORIDA, AUTHORIZING THE CITY MANAGER AND THE CITY CLERK TO EXECUTE AND ATTEST RESPECTIVELY, THAT CERTAIN SUPPLEMENTAL AGREEMENT WITH THE STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION LOCAL AGENCY PROJECT, A COPY OF WHICH IS ATTACHED HERETO AS EXHIBIT “A”; PROVIDING FOR INSTRUCTIONS TO THE CITY CLERK; PROVIDING FOR THE ADOPTION OF REPRESENTATIONS; PROVIDING FOR AN EFFECTIVE DATE. Staff Summary: Background The City of Miami Gardens received $2,516,740 in American Recovery and Reinvestment (ARRA) stimulus funds through the Florida Department of Transportation for the City’s roads that are designated by Federal Highway Administration (FHWA). These roads are also designated as emergency ITEM K-4) CONSENT AGENDA RESOLUTION Agreement w/FDOT 1515 NW 167 Street, Building 5 Suite 200 Miami Gardens, Florida 33169 roads (ER) by the US Department of Transportation; therefore, this funding can only be used for FHWAER roads. In 2010, Council approved three (3) road projects for resurfacing, sidewalk repairs/installation, and guardrail repairs. All three projects have been completed. After these projects were completed, unspent funds from the total ARRA allocation were allocated to replace the NW 42 Avenue (cross streets: NW 178 Drive and NW 179 Street) Bridge to include the bridge sidewalks, re‐alignment of the road, guardrail, street lighting (bridge construction area), and any drainage issues. The existing bridge has had safety issues for children walking to school and vehicles constantly hitting the guardrail because of road mis‐alignment, lighting issues, and being too steep for crossing visibility. Current Situation The Local Agency Project (LAP) agreement for this project was approved by Council under Resolution # 2011‐119‐1512. FDOT requires the City to execute an amendment to the original agreement in which the City agrees to pay the difference in the project cost. The difference, in the amount of $53,658, has been allocated in the City’s Stormwater Fund, and it was approved by Council under the aforementioned resolution. Proposed Action: It is recommended that the City Council approve the attached resolution authorizing the City Manager to execute the LAP amendment and all other required documents associated with this project. Attachment: Attachment A ‐Resolution # 2011‐119‐1512 Attachment B – LAP amendment Attachment C – LAP Supplemental Agreement