Loading...
HomeMy WebLinkAbout2012-059-1654 - Awarding a bid to Magna Contruction Inc 1515 NW 167 Street, Building 5 Suite 200 Miami Gardens, Florida 33169 City of Miami Gardens Agenda Cover Memo Council Meeting Date: April 11 ,2012 Item Type: (Enter X in box) Resolution Ordinance Other X Fiscal Impact: (Enter X in box) Yes No Ordinance Reading: (Enter X in box) 1st Reading 2nd Reading X Public Hearing: (Enter X in box) Yes No Yes No X X Funding Source: Community Development Block Grant Funds (CDBG) Advertising Requirement: (Enter X in box) Yes No X Contract/P.O. Required: (Enter X in box) Yes No RFP/RFQ/Bid #: ITB #10‐11‐070 Livable Neighborhood Improvements – Vista Verde X Strategic Plan Related (Enter X in box) Yes No Strategic Plan Priority Area: Enhance Organizational Bus. & Economic Dev Public Safety Quality of Education Qual. of Life & City Image Communcation Strategic Plan Obj./Strategy: (list the specific objective/strategy this item will address) X Sponsor Name Danny O. Crew, City Manager Department: Public Works/Stormwater Short Title: A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF MIAMI GARDENS, FLORIDA, AWARDING A BID TO MAGNA CONSTRUCTION, INC. IN THE AMOUNT OF THREE HUNDRED FOURTEEN THOUSAND, THREE HUNDRED THIRTY‐FOUR DOLLARS AND NINETY CENTS ($314,334.90), WHICH INCLUDES A TEN PERCENT (10%) CONTINGENCY IN THE AMOUNT OF TWENTY‐EIGHT THOUSAND, FIVE HUNDRED SEVENTY‐FIVE DOLLARS AND NINETY CENTS ($28,575.90), FOR PHASE 1B INFRASTRUCTURE IMPROVEMENTS IN THE VISTA VERDE NEIGHBORHOOD; AUTHORIZING THE CITY MANGER AND THE CITY CLERK TO EXECUTE AND ATTEST RESPECTIVELY, THAT CERTAIN AGREEMENT WITH MAGNA CONSTRUCTION, INC. FOR THIS PURPOSE, A COPY OF WHICH IS ATTACHED HERETO AS EXHIBIT “A”; PROVIDING FOR INSTRUCTIONS TO THE CITY CLERK; PROVIDING FOR THE ADOPTION OF REPRESENTATIONS; PROVIDING FOR AN EFFECTIVE DATE. Staff Summary: ITEM K-4) CONSENT AGENDA RESOLUTION Awarding a bid to Magna Construction Inc. 1515 NW 167 Street, Building 5 Suite 200 Miami Gardens, Florida 33169 Background In 2007, the Department of Community Development began the Livable Neighborhoods Initiative project. This project consists of comprehensive infrastructure improvements in three (3) residential neighborhoods deemed by our Public Works Department to be among the worst in the city. The 3 neighborhoods consist of: 1. Garden Circle 2. Kings Gardens I & II 3. Vista Verde/Miramar Gardens On May 6, 2010, with the successful completion of the Kings Gardens I & II neighborhood improvements, City Staff held a community meeting with the residents of the Garden Circle, Kings Gardens III and Vista Verde/Miramar Gardens neighborhoods. At this meeting Staff provided a recap of all of the City’s efforts up to this point, including the various community meetings, the preliminary engineering work, the numerous mailers containing project information, and most recently the pictures of a completed portion of the project area; all done to encourage those neighborhoods that had not yet conveyed ownership of the right‐of‐ways to the City to do so. As a result of this meeting, the Board of Directors of the Vista Verde Townhouse Homeowners Association, Inc. held a Special Meeting on October 18, 2010, where a resolution was passed to convey to the City of Miami Gardens the right‐of‐ways to the neighborhood’s paved streets and cul‐de‐sacs in the Vista Verde Townhouse Sections A, B and C. The Council accepted the road conveyance on January 12, 2011. On January 12, 2011, the City Council approved and authorized Craven and Thompson Associates, Inc. (CTA) to prepare the necessary construction documents for the construction of drainage infrastructure, and roadway improvements to be constructed in two phases. Current Situation Phase 1 of this project is currently under construction. The plans and specs prepared by CTA for phase 1B were advertised as ITB #11‐12‐012 on Feburary 16, 2012. A broadcast notice was sent to 788 vendors; seventeen (17) bid packages were requested. The bids were opened on March 15, 2012. Twelve (12) bids were received and publicly read at that time. Pam Thompson, Procurement Manager and Damian Cartwright, Craven Thompson & Associates evaluated the bids for compliance with the specifications and their ability to perform the work. The two (2) lowest, responsible bids (in the order of their bid) were: 1. Magna Construction, Inc. (located in Ft. Lauderdale) 2. Quality Paving Corp. (located in Miami) Reference checks were sent to the apparent low bidder. All references received were favorable. Patricia Varney, Finance Director, reviewed the Audited Financial Statements of the company and found the Magna Construction, Inc. financially stable. A copy of the ITB document and submittals are available for review at the office of the 1515 NW 167 Street, Building 5 Suite 200 Miami Gardens, Florida 33169 Assistant to the Mayor and Council. The apparent low bidder has successfully completed a drainage improvement project for the City in the past. The attached resolution seeks City Council approval to award the contract to Magna Construction, Inc., for phase 1B of the infrastructure improvements in the Vista Verde neighborhood and authorize the City Manager to execute the contract with this vendor for an amount not to exceed $314,334.90. This amount reflects a contingency amount of $28,575.90, (10% of bid) for unforeseen conditions given the nature of the work. It is noted that the recommended bidder will attempt in good faith to hire one or two new employees for this project. Proposed Action: That City Council approve the attached resolution. Attachment: Attachment A – Tabulation Attachment B‐Contract ITB#11‐12‐012 Livable Neighborhood Improvements Vista Verde phase 1B ‐Tabulation Sheet Item Qty. Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Gen Req $ 10,000.00 $ 12,000.00 $ 6,000.00 $ 15,000.00 $ 15,500.00 $ 17,200.00 MOT $ 500.00 $ 8,000.00 $ 8,000.00 $ 6,000.00 $ 2,800.00 $ 4,200.00 Sub‐Gen Req $ 10,500.00 $ 20,000.00 $ 14,000.00 $ 21,000.00 $ 18,300.00 $ 21,400.00 Drainage Remove pipe/trench 77 $ 12.00 $ 924.00 $ 5.00 $ 3 85.00 $ 10.00 $ 7 70.00 $ 8.00 $ 616.00 $ 15.00 $ 1,155.00 $ 10.00 $ 7 70.00 R & D Structures 4 $ 3 50.00 $ 1,400.00 $ 200.00 $ 8 00.00 $ 1 00.00 $ 4 00.00 $ 3 00.00 $ 1,200.00 $ 1 50.00 $ 6 00.00 $ 3 51.00 $ 1,404.00 Pipe 18" HDPE 378 $ 35.00 $ 13,230.00 $ 30.00 $ 11,340.00 $ 70.00 $ 26,460.00 $ 44.00 $ 16,632.00 $ 38.00 $ 14,364.00 $ 40.00 $ 15,120.00 Pipe 18" HDPE exf 774 $ 77.00 $ 59,598.00 $ 65.00 $ 50,310.00 $ 90.00 $ 69,660.00 $ 1 00.00 $ 77,400.00 $ 96.00 $ 74,304.00 $ 1 00.00 $ 77,400.00 4" basin 3 $ 1,800.00 $ 5,400.00 $ 1,800.00 $ 5,400.00 $ 3,500.00 $ 10,500.00 $ 3,000.00 $ 9,000.00 $ 2,550.00 $ 7,650.00 $ 2,530.00 $ 7,590.00 5' basin 8 $ 1,800.00 $ 14,400.00 $ 2,200.00 $ 17,600.00 $ 4,000.00 $ 32,000.00 $ 3,000.00 $ 24,000.00 $ 3,000.00 $ 24,000.00 $ 2,661.00 $ 21,288.00 4'manhole 2 $ 1,800.00 $ 3,600.00 $ 1,800.00 $ 3,600.00 $ 3,500.00 $ 7,000.00 $ 3,000.00 $ 6,000.00 $ 2,100.00 $ 4,200.00 $ 2,300.00 $ 4,600.00 Baffle 18 $ 2 50.00 $ 4,500.00 $ 250.00 $ 4,500.00 $ 1 20.00 $ 2,160.00 $ 2 20.00 $ 3,960.00 $ 1 30.00 $ 2,340.00 $ 2 56.00 $ 4,608.00 Invert baffle 3 $ 2 50.00 $ 750.00 $ 300.00 $ 9 00.00 $ 1 20.00 $ 3 60.00 $ 2 20.00 $ 660.00 $ 1 30.00 $ 3 90.00 $ 2 66.00 $ 7 98.00 connect ext.drain 1 $ 5 00.00 $ 500.00 $ 150.00 $ 1 50.00 $ 5 00.00 $ 5 00.00 $ 6 00.00 $ 600.00 $ 5 00.00 $ 5 00.00 $ 5 80.00 $ 5 80.00 F&I pipe end cap 4 $ 80.00 $ 320.00 $ 100.00 $ 4 00.00 $ 70.00 $ 2 80.00 $ 2 00.00 $ 800.00 $ 1 50.00 $ 6 00.00 $ 1 84.00 $ 7 36.00 excavation rock 100 $ 1.00 $ 100.00 $ 2.00 $ $ 2 00.00 $ 20.00 $ 2,000.00 $ 20.00 $ 2,000.00 $ 2.00 $ 2 00.00 $ 0.42 $ 42.00 F&P flowable fill 50 $ 60.00 $ 3,000.00 $ 150.00 $ 7,500.00 $ 1 20.00 $ 6,000.00 $ 1 20.00 $ 6,000.00 $ 85.00 $ 4,250.00 $ 50.00 $ 2,500.00 clean structure 3 $ 2 50.00 $ 750.00 $ 200.00 $ 6 00.00 $ 2 00.00 $ 6 00.00 $ 3 00.00 $ 900.00 $ 1 50.00 $ 4 50.00 $ 1 45.00 $ 4 35.00 clean pipe 150 $ 5.50 $ 825.00 $ 4.00 $ 6 00.00 $ 5.00 $ 7 50.00 $ 5.00 $ 750.00 $ 3.00 $ 4 50.00 $ 5.00 $ 7 50.00 Sub ‐Drainage $ 109,297.00 $ 104,285.00 $ 159,440.00 $ 150,518.00 $ 135,453.00 $ 138,621.00 Paving 2' Valley gutter 121 $ 25.00 $ 3,025.00 $ 15.00 $ 1,815.00 $ 12.00 $ 1,452.00 $ 20.00 $ 2,420.00 $ 16.00 $ 1,936.00 $ 16.30 $ 1,972.30 Type D curb 50 $ 16.00 $ 800.00 $ 15.00 $ 7 50.00 $ 10.00 $ 5 00.00 $ 18.00 $ 900.00 $ 13.00 $ 6 50.00 $ 12.40 $ 6 20.00 Type F curb 55 $ 16.00 $ 880.00 $ 18.00 $ 9 90.00 $ 15.00 $ 8 25.00 $ 20.00 $ 1,100.00 $ 16.00 $ 8 80.00 $ 16.80 $ 9 24.00 F&P 2" superpave 3190 $ 12.00 $ 38,280.00 $ 12.00 $ 38,280.00 $ 12.00 $ 38,280.00 $ 12.00 $ 38,280.00 $ 15.75 $ 50,242.50 $ 14.70 $ 46,893.00 F&P 8" limerock 3190 $ 9.00 $ 28,710.00 $ 10.00 $ 31,900.00 $ 12.00 $ 38,280.00 $ 10.00 $ 31,900.00 $ 12.60 $ 40,194.00 $ 9.70 $ 30,943.00 F&P 12" subgrade 3190 $ 1.00 $ 3,190.00 $ 3.00 $ 9,570.00 $ 5.00 $ 15,950.00 $ 5.00 $ 15,950.00 $ 1.80 $ 5,742.00 $ 8.50 $ 27,115.00 F&P 6" sidewalk 110 $ 45.00 $ 4,950.00 $ 30.00 $ 3,300.00 $ 45.00 $ 4,950.00 $ 40.00 $ 4,400.00 $ 45.00 $ 4,950.00 $ 36.60 $ 4,026.00 F&I truncated dome 30 $ 40.00 $ 1,200.00 $ 20.00 $ 6 00.00 $ 40.00 $ 1,200.00 $ 25.00 $ 750.00 $ 18.00 $ 5 40.00 $ 32.20 $ 9 66.00 R&D roadway 3190 $ 2.50 $ 7,975.00 $ 10.00 $ 31,900.00 $ 2.00 $ 6,380.00 $ 6.00 $ 19,140.00 $ 3.00 $ 9,570.00 $ 5.50 $ 17,545.00 E&M Equipment proposal is non‐responsive ‐bid bond submitted was 5% not 10% as required. Florida Engineering & Dev. Hialeah Gardens, FL Magna Construction Ft. Lauderdale, FL Quality Paving Corp. Miami, FL Metro Express Inc. Medley, FL Maggolc Inc. Miami, FL JVA Engineering Contractor Inc. Inc. Miami, FL pg 2 cont. ITB#11‐12‐012 Livable Neighborhood Improvements Vista Verde phase 1B ‐Tabulation Sheet Item Qty. Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price R&D valley gutter 231 $ 1.00 $ 231.00 $ 2.00 $ 4 62.00 $ 1.00 $ 2 31.00 $ 3.00 $ 693.00 $ 2.00 $ 4 62.00 $ 4.00 $ 9 24.00 R&D sidwalk 110 $ 9.00 $ 990.00 $ 2.00 $ 2 20.00 $ 1.00 $ 1 10.00 $ 10.00 $ 1,100.00 $ 4.00 $ 4 40.00 $ 3.00 $ 3 30.00 Aprons 3 $ 3 50.00 $ 1,050.00 $ 600.00 $ 1,800.00 $ 5 00.00 $ 1,500.00 $ 5 00.00 $ 1,500.00 $ 4 50.00 $ 1,350.00 $ 2 70.00 $ 8 10.00 Sub‐Paving $ 91,281.00 $ 121,587.00 $ 109,658.00 $ 118,133.00 $ 116,956.50 $ 133,068.30 Sign & Marking 24" white solid 53 $ 1.75 $ 92.75 $ 6.00 $ 3 18.00 $ 3.00 $ 1 59.00 $ 4.00 $ 212.00 $ 5.00 $ 2 65.00 $ 6.00 $ 3 18.00 6" double yellow 55 $ 2.50 $ 137.50 $ 14.00 $ 7 70.00 $ 5.00 $ 2 75.00 $ 2.00 $ 110.00 $ 3.00 $ 1 65.00 $ 4.60 $ 2 53.00 6" white solid 209 $ 1.75 $ 365.75 $ 2.00 $ 4 18.00 $ 2.00 $ $ 4 18.00 $ 1.00 $ 209.00 $ 1.00 $ 2 09.00 $ 3.50 $ 7 31.50 install signs 5 $ 2 75.00 $ 1,375.00 $ 300.00 $ 1,500.00 $ 3 00.00 $ 1,500.00 $ 2 00.00 $ 1,000.00 $ 3 75.00 $ 1,875.00 $ 2 30.00 $ 1,150.00 Sub‐Sign & Mark $ 1 ,971.00 $ 3,006.00 $ 2,352.00 $ 1,531.00 $ 2,514.00 $ 2,452.50 Miscellaneous F&I 8" sewer main 2 $ 1,000.00 $ 2,000.00 $ 700.00 $ 1,400.00 $ 1,000.00 $ 2,000.00 $ 1,000.00 $ 2,000.00 $ 1,000.00 $ 2,000.00 $ 1,600.00 $ 3,200.00 F&I 6" sewer lateral 10 $ 8 00.00 $ 8,000.00 $ 500.00 $ 5,000.00 $ 3 00.00 $ 3,000.00 $ 5 00.00 $ 5,000.00 $ 5 00.00 $ 5,000.00 $ 6 30.00 $ 6,300.00 F&I 6"lateral replace 5 $ 1,000.00 $ 5,000.00 $ 1,800.00 $ 9,000.00 $ 1,000.00 $ 5,000.00 $ 1,000.00 $ 5,000.00 $ 1,000.00 $ 5,000.00 $ 9 00.00 $ 4,500.00 R&D sewer pipe 490 $ 1.00 $ 490.00 $ 4.00 $ 1,960.00 $ 1.00 $ 4 90.00 $ 5.00 $ 2,450.00 $ 2.00 $ 9 80.00 $ 7.60 $ 3,724.00 Power pole 3 $ 2 50.00 $ 750.00 $ 1,000.00 $ 3,000.00 $ 2 00.00 $ 6 00.00 $ 4 00.00 $ 1,200.00 $ 5 00.00 $ 1,500.00 $ 5 75.00 $ 1,725.00 Adjust manhole 10 $ 1 50.00 $ 1,500.00 $ 250.00 $ 2,500.00 $ 2 00.00 $ 2,000.00 $ 3 00.00 $ 3,000.00 $ 3 00.00 $ 3,000.00 $ 2 55.00 $ 2,550.00 Relocate mail box 10 $ 50.00 $ 500.00 $ 100.00 $ 1,000.00 $ 1 00.00 $ 1,000.00 $ 30.00 $ 300.00 $ 1 00.00 $ 1,000.00 $ 60.00 $ 6 00.00 Relocate fence 50 $ 20.00 $ 1,000.00 $ 20.00 $ 1,000.00 $ 10.00 $ 5 00.00 $ 15.00 $ 750.00 $ 15.00 $ 7 50.00 $ 18.50 $ 9 25.00 F&I water service 15 $ 1,000.00 $ 15,000.00 $ 800.00 $ 12,000.00 $ 4 00.00 $ 6,000.00 $ 5 00.00 $ 7,500.00 $ 4 50.00 $ 6,750.00 $ 3 40.00 $ 5,100.00 Off‐Duty Police 1 $ 20,000.00 $ 20,000.00 $ 2 0,000.00 $ 20,000.00 $ 20,000.00 $ 20,000.00 $ 20,000.00 $ 20,000.00 $ 20,000.00 $ 20,000.00 $ 20,000.00 $ 20,000.00 Sub‐Misc. $ 54,240.00 $ 56,860.00 $ 40,590.00 $ 4 7,200.00 $ 45,980.00 $ 48,624.00 Grand Totals $ 2 67,289.00 $ 305,738.00 $ 326,040.00 $ 338,382.00 $ 319,203.50 $ 344,165.80 Alternate Repair Pot Holes 550 $ 9.00 $ 4,950.00 $ 50.00 $ 27,500.00 $ 22.00 $ 12,100.00 $ 32.00 $ 17,600.00 $ 25.00 $ 13,750.00 $ 54.50 $ 29,975.00 F&P Seal Coat 2704 $ 5.00 $ 13,520.00 $ 3.00 $ 8,112.00 $ 3.00 $ 8,112.00 $ 1.50 $ 4,056.00 $ 1.80 $ 4,867.20 $ 4.25 $ 11,492.00 Sub‐Total Alt. $ 18,470.00 $ 35,612.00 $ 20,212.00 $ 2 1,656.00 $ 18,617.20 $ 41,467.00 Totals w/Alt $ 2 85,759.00 $ 341,350.00 $ 346,252.00 $ 360,038.00 $ 337,820.70 $ 385,632.80 Magna Const. Quality Paving Metro Express Maggolc Inc JVA Engineering Florida Engineering & Dev ITB#11‐12‐012 Livable Neighborhood Improvements Vista Verde phase 1B ‐Tabulation Sheet Item Qty. Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Gen Req $ 20,944.44 $ 36,000.00 $ 20,000.00 $ 19,715.68 $ 10,000.00 $ 20,000.00 MOT $ 4,666.67 $ 15,000.00 $ 15,000.00 $ 9,350.44 $ 2,000.00 $ 7,000.00 Sub‐Gen Req $ 25,611.11 $ 51,000.00 $ 35,000.00 $ 29,066.12 $ 12,000.00 $ 27,000.00 Drainage Remove pipe/trench 77 $ 5.56 $ 428.12 $ 23.00 $ 1,771.00 $ 8.00 $ 6 16.00 $ 39.90 $ 3,072.30 $ 10.00 $ 7 70.00 $ 3.00 $ 2 31.00 R & D Structures 4 $ 1 66.67 $ 666.68 $ 290.00 $ 1,160.00 $ 1 00.00 $ 4 00.00 $ 6 88.82 $ 2,755.28 $ 3 00.00 $ 1,200.00 $ 1 25.00 $ 5 00.00 Pipe 18" HDPE 378 $ 34.77 $ 13,143.06 $ 34.00 $ 12,852.00 $ 48.00 $ 18,144.00 $ 74.80 $ 28,274.40 $ 60.00 $ 22,680.00 $ 57.00 $ 21,546.00 Pipe 18" HDPE exf 774 $ 79.18 $ 61,285.32 $ 94.00 $ 72,756.00 $ 1 10.00 $ 85,140.00 $ 1 12.21 $ 86,850.54 $ 90.00 $ 69,660.00 $ 1 05.00 $ 81,270.00 4" basin 3 $ 2,661.57 $ 7,984.71 $ 2,200.00 $ 6,600.00 $ 1,600.00 $ 4,800.00 $ 2,075.80 $ 6,227.40 $ 2,400.00 $ 7,200.00 $ 3,500.00 $ 10,500.00 5' basin 8 $ 2,757.56 $ 22,060.48 $ 2,500.00 $ 20,000.00 $ 1,900.00 $ 15,200.00 $ 2,474.75 $ 19,798.00 $ 2,800.00 $ 22,400.00 $ 3,500.00 $ 28,000.00 4'manhole 2 $ 2,372.78 $ 4,745.56 $ 1,900.00 $ 3,800.00 $ 2,000.00 $ 4,000.00 $ 2,075.80 $ 4,151.60 $ 3,000.00 $ 6,000.00 $ 3,500.00 $ 7,000.00 Baffle 18 $ 3 16.67 $ 5,700.06 $ 410.00 $ 7,380.00 $ 3 50.00 $ 6,300.00 $ 3 80.25 $ 6,844.50 $ 3 50.00 $ 6,300.00 $ 1 50.00 $ 2,700.00 Invert baffle 3 $ 3 13.22 $ 939.66 $ 400.00 $ 1,200.00 $ 4 00.00 $ 1,200.00 $ 3 80.25 $ 1,140.75 $ 4 50.00 $ 1,350.00 $ 1 50.00 $ 4 50.00 connect ext.drain 1 $ 2 24.12 $ 224.12 $ 2,700.00 $ 2,700.00 $ 5 00.00 $ 5 00.00 $ 1,215.56 $ 1,215.56 $ 1,000.00 $ 1,000.00 $ 1,200.00 $ 1,200.00 F&I pipe end cap 4 $ 2 17.93 $ 871.72 $ 150.00 $ 6 00.00 $ 4 50.00 $ 1,800.00 $ 87.27 $ 349.08 $ 3 50.00 $ 1,400.00 $ 1 50.00 $ 6 00.00 excavation rock 100 $ 1.11 $ 111.00 $ 5.20 $ 5 20.00 $ 20.00 $ 2,000.00 $ 13.43 $ 1,343.00 $ 10.00 $ 1,000.00 $ 5.00 $ 5 00.00 F&P flowable fill 50 $ 1 22.22 $ 6,111.00 $ 120.00 $ 6,000.00 $ 1 00.00 $ 5,000.00 $ 1 45.87 $ 7,293.50 $ 1 50.00 $ 7,500.00 $ 1 40.00 $ 7,000.00 clean structure 3 $ 1 66.67 $ 500.01 $ 310.00 $ 9 30.00 $ 2 50.00 $ 7 50.00 $ 2 49.35 $ 748.05 $ 2 50.00 $ 7 50.00 $ 1 80.00 $ 5 40.00 clean pipe 150 $ 8.89 $ 1,333.50 $ 6.10 $ 9 15.00 $ 8.00 $ 1,200.00 $ 14.26 $ 2,139.00 $ 15.00 $ 2,250.00 $ 27.00 $ 4,050.00 Sub ‐Drainage $ 126,105.00 $ 139,184.00 $ 147,050.00 $ 172,202.96 $ 151,460.00 $ 166,087.00 Paving 2' Valley gutter 121 $ 12.62 $ 1,527.02 $ 24.00 $ 2,904.00 $ 12.00 $ 1,452.00 $ 15.40 $ 1,863.40 $ 25.00 $ 3,025.00 $ 36.00 $ 4,356.00 Type D curb 50 $ 11.11 $ 555.50 $ 25.00 $ 1,250.00 $ 12.00 $ 6 00.00 $ 16.21 $ 810.50 $ 22.00 $ 1,100.00 $ 31.00 $ 1,550.00 Type F curb 55 $ 18.59 $ 1,022.45 $ 24.00 $ 1,320.00 $ 14.00 $ 7 70.00 $ 19.32 $ 1,062.60 $ 30.00 $ 1,650.00 $ 36.00 $ 1,980.00 F&P 2" superpave 3190 $ 14.00 $ 44,660.00 $ 7.80 $ 24,882.00 $ 15.00 $ 47,850.00 $ 23.39 $ 74,614.10 $ 20.00 $ 63,800.00 $ 17.00 $ 54,230.00 F&P 8" limerock 3190 $ 8.30 $ 26,477.00 $ 14.00 $ 44,660.00 $ 9.00 $ 28,710.00 $ 8.61 $ 27,465.90 $ 15.00 $ 47,850.00 $ 14.00 $ 44,660.00 F&P 12" subgrade 3190 $ 4.44 $ 14,163.60 $ 7.70 $ 24,563.00 $ 9.00 $ 28,710.00 $ 6.89 $ 21,979.10 $ 8.00 $ 25,520.00 $ 5.00 $ 15,950.00 F&P 6" sidewalk 110 $ 36.11 $ 3,972.10 $ 33.00 $ 3,630.00 $ 31.50 $ 3,465.00 $ 38.65 $ 4,251.50 $ 45.00 $ 4,950.00 $ 70.00 $ 7,700.00 F&I truncated dome 30 $ 22.22 $ 666.60 $ 32.00 $ 9 60.00 $ 25.00 $ 7 50.00 $ 32.41 $ 972.30 $ 25.00 $ 7 50.00 $ 18.00 $ 5 40.00 R&D roadway 3190 $ 3.83 $ 12,217.70 $ 8.60 $ 27,434.00 $ 8.00 $ 25,520.00 $ 10.62 $ 33,877.80 $ 15.00 $ 47,850.00 $ 6.00 $ 19,140.00 FHP Tectonics Corp. Miami, FL Straightline Engineering Group, LLC, Miami Gardens, FL Williams Paving Co., Inc. Medley, FL Acosta Tractors, Inc. Hialeah Gardens, FL Ric‐Man Internatioanl, Inc. Pompano Beach, FL TEAM Contracting Inc. Miami, FL pg 2 cont. ITB#11‐12‐012 Livable Neighborhood Improvements Vista Verde phase 1B ‐Tabulation Sheet Item Qty. Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price R&D valley gutter 231 $ 3.89 $ 898.59 $ 6.50 $ 1,501.50 $ 1.00 $ 2 31.00 $ 5.40 $ 1,247.40 $ 10.00 $ 2,310.00 $ 4.00 $ 9 24.00 R&D sidwalk 110 $ 16.50 $ 1,815.00 $ 15.00 $ 1,650.00 $ 3.00 $ 3 30.00 $ 16.05 $ 1,765.50 $ 30.00 $ 3,300.00 $ 9.00 $ 9 90.00 Aprons 3 $ 3 98.89 $ 1,196.67 $ 220.00 $ 6 60.00 $ 5 00.00 $ 1,500.00 $ 1,661.88 $ 4,985.64 $ 5 00.00 $ 1,500.00 $ 1,000.00 $ 3,000.00 Sub‐Paving $ 109,172.23 $ 135,414.50 $ 139,888.00 $ 174,895.74 $ 203,605.00 $ 155,020.00 Sign & Marking 24" white solid 53 $ 16.32 $ 864.96 $ 8.90 $ 4 71.70 $ 8.00 $ 4 24.00 $ 10.81 $ 572.93 $ 5.00 $ 2 65.00 $ 10.00 $ 5 30.00 6" double yellow 55 $ 8.97 $ 493.35 $ 3.40 $ 1 87.00 $ 4.00 $ 2 20.00 $ 2.49 $ 136.95 $ 5.00 $ 2 75.00 $ 5.00 $ 2 75.00 6" white solid 209 $ 4.08 $ 852.72 $ 3.00 $ 6 27.00 $ 3.00 $ 6 27.00 $ 1.13 $ 236.17 $ 5.00 $ 1,045.00 $ 3.00 $ 6 27.00 install signs 5 $ 2 83.33 $ 1,416.65 $ 250.00 $ 1,250.00 $ 4 00.00 $ 2,000.00 $ 2 80.51 $ 1,402.55 $ 3 50.00 $ 1,750.00 $ 5 00.00 $ 2,500.00 Sub‐Sign & Mark $ 3 ,627.68 $ 2,535.70 $ 3,271.00 $ 2,348.60 $ 3,335.00 $ 3,932.00 Miscellaneous F&I 8" sewer main 2 $ 3,661.21 $ 7,322.42 $ 3,000.00 $ 6,000.00 $ 1,500.00 $ 3,000.00 $ 2,244.11 $ 4,488.22 $ 3,000.00 $ 6,000.00 $ 1,600.00 $ 3,200.00 F&I 6" sewer lateral 10 $ 3,013.41 $ 30,134.10 $ 1,400.00 $ 14,000.00 $ 1,000.00 $ 10,000.00 $ 1,745.42 $ 17,454.20 $ 3,000.00 $ 30,000.00 $ 1,500.00 $ 15,000.00 F&I 6"lateral replace 5 $ 6,923.69 $ 34,618.45 $ 1,500.00 $ 7,500.00 $ 2,000.00 $ 10,000.00 $ 4,114.19 $ 20,570.95 $ 3,000.00 $ 15,000.00 $ 5,300.00 $ 26,500.00 R&D sewer pipe 490 $ 6.01 $ 2,944.90 $ 2.50 $ 1,225.00 $ 10.00 $ 4,900.00 $ 5.59 $ 2,739.10 $ 25.00 $ 12,250.00 $ 2.00 $ 9 80.00 Power pole 3 $ 2 77.78 $ 833.34 $ 1,900.00 $ 5,700.00 $ 5 00.00 $ 1,500.00 $ 3 11.68 $ 935.04 $ 7 50.00 50.00 $ 2,250.00 $ 1,200.00 $ 3,600.00 Adjust manhole 10 $ 1 52.78 $ 1,527.80 $ 200.00 $ 2,000.00 $ 2 00.00 $ 2,000.00 $ 2 18.18 $ 2,181.80 $ 3 50.00 $ 3,500.00 $ 1 50.00 $ 1,500.00 Relocate mail box 10 $ 83.33 $ 833.30 $ 130.00 $ 1,300.00 $ 50.00 $ 5 00.00 $ 49.87 $ 498.70 $ 50.00 $ 5 00.00 $ 3 00.00 $ 3,000.00 Relocate fence 50 $ 11.11 $ 555.50 $ 14.00 $ 7 00.00 $ 15.00 $ 7 50.00 $ 37.40 $ 1,870.00 $ 20.00 $ 1,000.00 $ 18.00 $ 9 00.00 F&I water service 15 $ 1,680.46 $ 25,206.90 $ 930.00 $ 13,950.00 $ 1,500.00 $ 22,500.00 $ 1,683.08 $ 25,246.20 $ 1,250.00 $ 18,750.00 $ 4,500.00 $ 67,500.00 Off‐Duty Police 1 $ 20,000.00 $ 20,000.00 $ 2 0,000.00 $ 20,000.00 $ 20,000.00 $ 20,000.00 $ 20,000.00 $ 20,000.00 $ 20,000.00 $ 20,000.00 $ 20,000.00 $ 20,000.00 Sub‐Misc. $ 123,976.71 $ 72,375.00 $ 75,150.00 $ 9 5,984.21 $ 109,250.00 $ 142,180.00 Grand Totals $ 3 88,492.73 $ 400,509.20 $ 400,359.00 $ 474,497.63 $ 479,650.00 $ 494,219.00 Alternate Repair Pot Holes 550 $ 23.52 $ 12,936.00 $ 21.00 $ 11,550.00 $ 27.00 $ 14,850.00 $ 15.40 $ 8,470.00 $ 35.00 $ 19,250.00 $ 34.00 $ 18,700.00 F&P Seal Coat 2704 $ 2.44 $ 6,597.76 $ 6.00 $ 16,224.00 $ 10.00 $ 27,040.00 $ 1.68 $ 4,542.72 $ 5.00 $ 13,520.00 $ 2.00 $ 5,408.00 Sub‐Total Alt. $ 19,533.76 $ 27,774.00 $ 41,890.00 $ 13,012.72 $ 32,770.00 $ 24,108.00 Totals w/Alt $ 4 08,026.49 $ 428,283.20 $ 442,249.00 $ 487,510.35 $ 512,420.00 $ 518,327.00 This is only a tabulation of prices submitted and is not an indication of award or responsiveness Acosta Tractors Ric‐Man International TEAM Contracting FHP Tectonics Straightline Engineering