Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2011-185-1578 - Awarding Bid Florida Engineering and Development Corp.
City of Miami Gardens Agenda Cover Memo Council Meeting Date: November 9 ,2011 Item Type: (Enter X in box) Resolution Ordinance Other X Fiscal Impact: (Enter X in box) Y es N o Ordinance Reading: (Enter X in box) 1 st Reading 2 nd Reading Public Hearing: (Enter X in box) Yes No Yes No X X Funding Source: Community Development Block Grant Funds (CDBG) Advertising Requirement: (Enter X in box) Yes No X Contract/P.O. Required: (Enter X in box) Yes N o RFP/RFQ/Bid #: ITB #10 ‐11 ‐070 Livable Neighborhood Improvements – Vista Verde X Strategic Plan Related (Enter X in box) Yes N o Strategic Plan Priority Area: Enhance Organizational Bus. & Economic Dev Public Safety Quality of Education Qual. of Life & City Image Communcation Strategic Plan Obj./Strategy: (list the specific objective/strategy this item will address) X Sponsor Name Danny O. Crew, City Manager Department: Public Works/Stormwater Short Title: A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF MIAMI GARDENS, FLORIDA, AWARDING A BID TO FLORIDA ENGINEERING AND DEVELOPMENT CORP. FOR INFRASTRUCTURE IMPROVEMENTS IN THE VISTA VERDE NEIGHBORHOOD; AUTHORIZING THE CITY MANAGER AND CITY CLERK TO EXECUTE AND ATTEST RESPECTIVELY, THAT CERTAIN AGREEMENT ATTACHED HERETO AS EXHIBIT “A” FOR THIS PURPOSE, IN AN AMOUNT NOT TO EXCEED SIX HUNDRED SEVENTY THOUSAND, EIGHT HUNDRED SIXTY ‐FIVE DOLLARS AND SEVENTY CENTS ($670,865.70) WHICH AMOUNT INCLUDES A THIRTY THOUSAND DOLLAR ($30,000.00) CONTINGENCY FOR OFF ‐DUTY POLICE SERVICES; PROVIDING FOR INSTRUCTIONS TO THE CITY CLERK; PROVIDING FOR THE ADOPTION OF REPRESENTATIONS; PROVIDING AN EFFECTIVE DATE. Staff Summary: Background ITEM K-4) CONSENT AGENDA RESOLUTION Agreement w/ Florida Engineering and Development Corp. 1515 NW 167 Street, Building 5 Suite 200 Miami Gardens, Florida 33169 In 2007, the Department of Community Development began the Livable Neighborhoods Initiative project. This project consists of comprehensive infrastructure improvements in three (3) residential neighborhoods deemed by our Public Works Department to be among the worst in the city. The 3 neighborhoods consist of: 1. Garden Circle 2. Kings Gardens I & II 3. Vista Verde/Miramar Gardens On May 6, 2010, with the successful completion of the Kings Gardens I & II neighborhood improvements, City Staff held a community meeting with the residents of the Garden Circle, Kings Gardens III and Vista Verde/Miramar Gardens neighborhoods. At this meeting Staff provided a recap of all of the City’s efforts up to this point, including the various community meetings, the preliminary engineering work, the numerous mailers containing project information, and most recently the pictures of a completed portion of the project area; all done to encourage those neighborhoods that had not yet conveyed ownership of the right ‐of ‐ways to the City to do so. As a result of this meeting, the Board of Directors of the Vista Verde Townhouse Homeowners Association, Inc. held a Special Meeting on October 18, 2010, where a resolution was passed to convey to the City of Miami Gardens the right ‐of ‐ways to the neighborhood’s paved streets and cul ‐de ‐sacs in the Vista Verde Townhouse Sections A, B and C. The Council accepted the road conveyance on January 12, 2011. On January 12, 2011, the City Council approved and authorized Craven and Thompson Associates, Inc. (CTA) to prepare the necessary construction documents for the construction of drainage infrastructure, and roadway improvements to be constructed in two phases. Current Situation The plans and specs prepared by CTA for phase I, were advertised as ITB #10 ‐11 ‐070 on Septemer 23, 2011. A broadcast notice was sent to 923 vendors, seventeen (17) bid packages were requested. The bids were opened on October 27, 2011. Ten (10) bids were received and publicity read at that time. Pam Thompson, Procurement Manager and Damian Cartwright, Craven Thompson & Associates evaluated the bids for compliance with the specifications and their ability to perform the work. The two (2) lowest, responsible bids (in the order of their bid) were: 1. Florida Engineering and Development, Corp. of Hialeah Gardens, Florida 2. Williams Paving Co., Inc. of Medley, Florida Reference checks were sent to the two low bidders. All references received were favorable. Patricia Varney, Finance Director, reviewed the Audited Financial Statements of both companies and found both companies financially stable. A copy of the ITB document and submittals are available for review at the office of the Assistant to the Mayor and Council. 1515 NW 167 Street, Building 5 Suite 200 Miami Gardens, Florida 33169 The attached resolution seeks City Council approval to award the contract to Florida Engineering and Development, Corp., for infrastructure improvements in the Vista Verde neighborhood and authorize the City Manager to execute the contract with this vendor for an amount not to exceed $670,865.70. This amount reflects a $30,000 contingency which Staff anticipates will be needed to cover the costs of off ‐duty police services given the nature of the work and the value of the equipment that will be out in the field. It is noted that the recommended bidder will not need to hire any new employees, as they will be using existing staff to peform the work. Proposed Action: That the City Council approve the attached resolution. Attachment: Attachment A – Tabulation Attachment B ‐Contract FL Maggolc Inc. of Miami FL Graham Development, Inc Pembroke Pines, FL $ean pe $$$100 $0 $$$$$$$$ITB#10 ‐11 ‐070 Livable Neighborhood Improvements Vista Verde ‐ Tabulation Sheet Item Florida Engine Corp. of Hialea ering and Development h Gardens, FL W illiams Paving Co., Inc. of Medley FL Southeaste Contractors,rn Engineering Inc. of Hialeah Gardens FL Team Contracting of Miami Unit Price Total Price U nit Price Total Pric e Unit Price Total Price Unit Pric eTotal Price Unit PriceTotal Price Unit PriceTotal Price Gen Req 17,500.00 $ $ 17,500.00 $40,000 .00$ 40,000.0 033,724$ .00$ 33,724.00 24,2$ 00.00 24,200.00 $ 34,000.00 $ 34,000.00 $ 35,126.25 $ 35,126.25 $ MOT 2,650.00 $ $ 2,650.00 $15,000 .00$ 15,000.0 09,430$ .00$ 9,430.00 20,0$ 00.00 20,000.00 $ 6,000.00 $ 6,000.00 $ 5,592.00 $ 5,592.00 $ Sub ‐Gen Req $ 20,150.00 55,000.0 $ 0 $ 43,154.00 44,200.00 $ 40,000.00 $ 40,718.25 $ Drainage Remove pipe 10.80 $ $ 4,752.00 $ 2.50$ 1,100.0 011$ .00$ 4,840.00 $ 8.00 3,520.00 $ 8.00 $ 3,520.00 $ 32.30 $ 14,212.00 $ Remove strut.365.00 $ $ 3,285.00 $170 .00$ 1,530.0 0340$ .00$ 3,060.00 $ 100.00 900.00 $ 300.00 $ 2,700.00 $ 325.00 $ 2,925.00 $ Pipe 15" HDPE 32.00 $ $ 2,816.00 $32 .50$ 2,860.0 039$ .00$ 3,432.00 $ 35.00 3,080.00 $ 43.00 $ 3,784.00 $ 44.22 $ 3,891.36 $ Pipe 15" HDPE exf 92.80 $ $ 5,753.60 $88 .00$ 5,456.0 0103$ .00$ 6,386.00 $ 35.00 2,170.00 $ 90.00 $ 5,580.00 $ 47.44 $ 2,941.28 $ Pipe 18" HDPE 34.60 $ $ 26,503.60 $35 .00$ 26,810.0 044$ .00$ 33,704.00 $ 48.00 36,768.00 $ 43.00 $ 32,938.00 $ 54.32 $ 41,609.12 $ Pipe 18" HDPE exf 102.50 $ $ 131,097.50 $89 .00$ 113,831.0 098$ .00$ 125,342.00 $ 100.00 127,900.00 $ 98.00 $ 125,342.00 $ 58.66 $ 75,026.14 $ 4" basin 2,350.00 $ $ 32,250.00 $2,260 .00$ 33,900.0 01,983$ .00$ 29,745.00 1,6$ 00.00 24,000.00 $ 2,800.00 $ 42,000.00 $ 1,250.00 $ 18,750.00 $ 5' basin 2,360.00 $ $ 11,800.00 $2,715 .00$ 13,575.0 02,636$ .00$ 13,180.00 2,5$ 00.00 12,500.00 $ 3,100.00 $ 15,500.00 $ 1,360.00 $ 6,800.00 $ 6' basin 2,920.00 $ $ 8,760.00 $3,250 .00$ 9,750.0 03,412$ .00$ 10,236.00 2,6$ 00.00 7,800.00 $ 3,600.00 $ 10,800.00 $ 1,390.00 $ 4,170.00 $ 4'manhole 2,300.00 $ $ 6,900.00 $2,160 .00$ 6,480.0 01,927$ .00$ 5,781.00 1,8$ 00.00 5,400.00 $ 2,800.00 $ 8,400.00 $ 2,500.00 $ 7,500.00 $ 5' manhole 2,300.00 $ $ 16,100.00 $2,365 .00$ 16,555.0 02,495$ .00$ 17,465.00 2,6$ 00.00 18,200.00 $ 3,100.00 $ 21,700.00 $ 2,950.00 $ 20,650.00 $ 6'manhole 4,400.00 $ $ 4,400.00 $3,960 .00$ 3,960.0 03,623$ .00$ 3,623.00 3,0$ 00.00 3,000.00 $ 3,800.00 $ 3,800.00 $ 3,150.00 $ 3,150.00 $ Baffle 260.00 $ $ 5,980.00 $325 .00$ 7,475.0 0228$ .00$ 5,244.00 $ 350.00 8,050.00 $ 200.00 $ 4,600.00 $ 425.00 $ 9,775.00 $ Invert baffle 273.50 $ $ 547.00 $305 .00$ 610.0 0235$ .00$ 470.00 $ 400.00 800.00 $ 300.00 $ 600.00 $ 690.00 $ 1,380.00 $ connect ext.d rain 161.00 $ $ 805.00 $1,175 .00$ 5,875.0 0230$ .00$ 1,150.00 $ 500.00 2,500.00 $ 250.00 $ 1,250.00 $ 1,450.00 $ 7,250.00 $ connect drain 571.00 $ $ 1,142.00 $945 .00$ 1,890.0 0402$ .50$ 805.00 $ 800.00 1,600.00 $ 200.00 $ 400.00 $ 1,750.00 $ 3,500.00 $ connect pipe topipe 270.00 $ $ 810.00 $900 .00$ 2,700.0 0172$ .50$ 517.50 $ 650.00 1,950.00 $ 150.00 $ 450.00 $ 1,250.00 $ 3,750.00 $ plug invert 140.00 $ $ 140.00 $1,045 .00$ 1,045.0 0115$ .00$ 115.00 $ 700.00 700.00 $ 300.00 $ 300.00 $ 400.00 $ 400.00 $ F&I pipe end c ap 156.00 $ $ 1,248.00 $275 .00$ 2,200.0 0263$ .50$ 2,108.00 $ 450.00 3,600.00 $ 250.00 $ 2,000.00 $ 895.00 $ 7,160.00 $ excavation roc k 14.50 $ $ 1,450.00 $ 0.25$ 25.0 023$ .00$ 2,300.00 $ 20.00 2,000.00 $ 20.00 $ 2,000.00 $ 42.50 $ 4,250.00 $ F&P flowable fill 140.00 $ $ 14,000.00 $27 .50$ 2,750.0 0110$ .00$ 11,000.00 $ 100.00 10,000.00 $ 120.00 $ 12,000.00 $ 167.02 $ 16,702.00 $ clean structur e 145.00 $ $ 725.00 $85 .00$ 425.0 0149$ .50$ 747.50 $ 300.00 1,500.00 $ 300.00 $ 1,500.00 $ 766.78 $ 3,833.90 $ clean pipe c l p i 49 0 $4.90 $ 1 347 50 1,347.50 40 0 $4.00 1 100 ,1.0 00 23 $02 0 $.3 632 50 632.50 $ 10 00 2 750 00 $50 0 $1 375 00 $15 80 $4 345 00 $10.00 2,750.00 5.00 1,375.00 15.80 4,345.00 Sub ‐Drainage $ 285,612.20 261,902.0 $ 0 $ 281,883.50 280,688.00 $ 302,539.00 $ 21,014.04 $ 263,970.80 $ Paving 2' Valley gutte r 15.90 $ $ 5,453.70 $40 .00$ 13,720.0 019$ .30$ 6,619.90 $ 14.00 4,802.00 $ 22.00 $ 7,546.00 $ 18.87 $ 6,472.41 $ FL Maggolc Inc. of Miami FL Graham Development, Inc Pembroke Pines, FL $Relocate mail box 58 $ 1 ,160 00 $ .$ 3 ,.$ .$ 1 ,610 00 $ 50 $ 1 ,000 00 $ 30 $ 600 00 $ 150 00 $ 3 ,000 00 $ Type D curb 11.00 $ $ 6,523.00 $10 .00$ 5,930.0 019$ .30$ 11,444.90 $ 14.00 8,302.00 $ 16.00 $ 9,488.00 $ 19.25 $ 11,415.25 $ ITB#10 ‐11 ‐070 Livable Neighborhood Improvements Vista Verde ‐ Tabulation Sheet Florida Engine Corp. ering and Development W illiams Paving Co., Inc. Southeaste Contractors,rn Engineering Inc. of Hialeah Gardens Team Contracting of Miami FL cont.Unit Price Total Price U nit Price Total Pric e Unit Price Total Price Unit Pric eTotal Price Unit PriceTotal Price Unit PriceTotal Price Type F curb 15.30 $ $ 1,989.00 $42 .00$ 5,460.0 019$ .30$ 2,509.00 $ 16.00 2,080.00 $ 25.00 $ 3,250.00 $ 17.30 $ 2,249.00 $ Mill 1"10.20 $ $ 12,770.40 $ 9.50$ 11,894.0 08$ .60$ 10,767.20 $ 15.00 18,780.00 $ 12.00 $ 15,024.00 $ 9.25 $ 11,581.00 $ F&P 2" superp ave 14.20 $ $ 73,385.60 $12 .00$ 62,016.0 017$ .10$ 88,372.80 $ 15.00 77,520.00 $ 15.00 $ 77,520.00 $ 14.75 $ 76,228.00 $ F&P 8" limero ck 9.60 $ $ 49,612.80 $10 .00$ 51,680.0 010$ .40$ 53,747.20 $ 9.00 46,512.00 $ 10.80 $ 55,814.00 $ 10.75 $ 55,556.00 $ F&P 12" subgr ade 8.70 $ $ 44,961.60 $ 3.00$ 15,504.0 02$ .90$ 14,987.20 $ 9.00 46,512.00 $ 6.00 $ 31,008.00 $ 7.44 $ 38,449.92 $ F&P 6" sidewa lk 35.80 $ $ 11,921.40 $42 .00$ 13,986.0 042$ .50$ 14,152.50 $ 30.00 9,990.00 $ 40.00 $ 13,320.00 $ 23.99 $ 7,988.67 $ F&I truncated dome 33.00 $ $ 2,640.00 $15 .00$ 1,200.0 032$ .50$ 2,600.00 $ 25.00 2,000.00 $ 25.00 $ 2,000.00 $ 65.20 $ 5,216.00 $ R&D roadway 5.90 $ $ 30,491.20 $ 6.00$ 31,008.0 03$ .80$ 19,638.40 $ 9.00 46,512.00 $ 12.00 $ 62,016.00 $ 5.96 $ 30,801.28 $ R&D valley gu tter 4.20 $ $ 4,468.80 $ 1.75$ 1,862.0 04$ .60$ 4,894.40 $ 1.00 1,064.00 $ 5.00 $ 5,320.00 $ 10.44 $ 11,108.16 $ R&D sidwalk 3.00 $ $ 999.00 $ 5.00$ 1,665.0 010$ .40$ 3,463.20 $ 4.00 1,332.00 $ 18.00 $ 5,994.00 $ 20.22 $ 6,733.26 $ Aprons 270.00 $ $ 1,350.00 $615 .00$ 3,075.0 0448$ .50$ 2,242.50 $ 500.00 2,500.00 $ 500.00 $ 2,500.00 $ 5,250.00 $ 2,625.00 $ Sub ‐Paving $ 246,566.50 219,000.0 $ 0 $ 235,439.20 267,906.00 $ 290,800.40 $ 5,435.30 $ 266,423.95 $ Sign & Marking 24" white solid 5.00 $ $ 595.00 $ 3.50$ 416.5 02$ .90$ 345.10 $ 8.00 952.00 $ 5.00 $ 595.00 $ 19.62 $ 2,334.78 $ 6" double yell ow 2.00 $ $ 496.00 $ 1.75$ 434.0 01$ .40$ 347.20 $ 4.00 992.00 $ 2.00 $ 496.00 $ 5.20 $ 1,289.60 $ 6" white solid 1.40 $ $ 756.00 $ 1.75$ 945.0 03$ .30$ 1,782.00 $ 3.00 1,620.00 $ 1.00 $ 540.00 $ 5.00 $ 2,700.00 $ install signs 225.00 $ $ 2,250.00 $275 .00$ 2,750.0 0212$ .80$ 2,128.00 $ 400.00 4,000.00 $ 250.00 $ 2,500.00 $ 1,849.00 $ 18,490.00 $ Sub ‐Sign & Mar k $ 4,097.00 4,545.5 $ 0 $ 4,602.30 7,564.00 $ 4,131.00 $ 1,878.82 $ 24,814.38 $ Miscellaneous F&I 8" sewer main 1,871.00 $ $ 9,355.00 $2,000 .00$ 10,000.0 01,691$ .70$ 8,458.50 1,6$ 00.00 8,000.00 $ 2,000.00 $ 10,000.00 $ 900.00 $ 4,500.00 $ F&I 6" sewer lateral 1,300.00 $ $ 32,500.00 $1,500 .00$ 37,500.0 01,611$ .20$ 40,280.00 $ 800.00 20,000.00 $ 400.00 $ 10,000.00 $ 850.00 $ 21,250.00 $ F&I 6"lateral r eplace 1,500.00 $ $ 15,000.00 $4,000 .00$ 40,000.0 01,242$ .20$ 12,422.00 3,5$ 00.00 35,000.00 $ 2,000.00 $ 20,000.00 $ 1,675.00 $ 16,750.00 $ R&D sewer pi pe 7.00 $ $ 7,700.00 $ 1.00$ 1,100.0 01$ .60$ 1,760.00 $ 10.00 11,000.00 $ 5.00 $ 5,500.00 $ 2,950.00 $ 32,450.00 $ Power pole 600.00 $ $ 3,000.00 $150 .00$ 750.0 02,300$ .00$ 11,500.00 $ 500.00 2,500.00 $ 500.00 $ 2,500.00 $ 4,875.00 $ 24,375.00 $ Adjust manho le 115.00 $ $ 2,875.00 $150 .00$ 3,750.0 0402$ .50$ 10,062.50 $ 200.00 5,000.00 $ 300.00 $ 7,500.00 $ 195.00 $ 4,875.00 $ Relocate mail box 58.00 $ .00 $ 1 ,160.00 .150 150 .00 $ 00 3 ,000.0 000 080 $ 00 80 .50 $ 50 1 ,610.00 .$ 50.00 1 ,000.00 $ 30.00 $ 600.00 $ 150.00 $ 3 ,000.00 $ .00 ..00 ...Relocate fence 18.50 $ $ 1,850.00 $12 .00$ 1,200.0 020$ .70$ 2,070.00 $ 15.00 1,500.00 $ 15.00 $ 1,500.00 $ 6.25 $ 625.00 $ Clean & TV sys tem 11,000.00 $ $ 11,000.00 $7,000 .00$ 7,000.0 010,925$ .00$ 10,925.00 15,0$ 00.00 15,000.00 $ 5,000.00 $ 5,000.00 $ 3,900.00 $ 3,900.00 $ Off ‐Duty Polic e 30,000.00 $ $ 30,000.00 $30,000 .00$ 30,000.0 030,000$ .00$ 30,000.00 30,0$ 00.00 30,000.00 $ 30,000.00 $ 30,000.00 $ 30,000.00 $ 30,000.00 $ $ Inc Hialeah Gardens, FL Metro Express, Inc. of Medley FL Pi pe HDPE ex f $$$1155 $$$$$Sub ‐Misc.$ 114,440.00 134,300.0 $ 0 $ 129,088.00 129,000.00 $ 92,600.00 $ 45,501.25 $ 141,725.00 $ Grand Totals 670$ ,865.70 674,747.50 $ $ 694,167.00 729,358.00 $ 730,070.40 $ 737,651.99 $ ITB#10 ‐11 ‐070 Livable Neighborhood Improvements Vista Verde ‐ Tabulation Sheet Item JVA Engineerin Miami FL g Contrator, Inc. of In Po tercounty Engineering In mpano Bch, FL c. of Acosta Tractors,Unit Price Total Price U nit Price Total Pric e Unit PriceTotal Price Unit PriceTotal Price Gen Req 20,000.00 $ $ 20,000.00 $17,000 .00$ 17,000.0 038,600.00 $ 38,600.00 $ 35,000.00 $ 35,000.00 $ MOT 5,000.00 $ $ 5,000.00 $7,314 .00$ 7,314.0 08,752.94 $ 8,752.94 $ 14,000.00 $ 14,000.00 $ Sub ‐Gen Req $ 25,000.00 24,314.0 $ 0 47,352.94 $ 47,352.94 $ 49,000.00 $ Drainage Remove pipe 6.50 $ $ 2,860.00 $25 .00$ 11,000.0 07.82 $ 3,440.80 $ 20.00 $ 8,800.00 $ Remove strut.250.00 $ $ 2,250.00 $595 .00$ 5,355.0 0294.12 $ 2,647.08 $ 300.00 $ 2,700.00 $ Pipe 15" HDPE 45.00 $ $ 3,960.00 $38 .00$ 3,344.0 027.84 $ 2,449.92 $ 75.00 $ 6,600.00 $ Pipe 15" HDPE exf 105.00 $ $ 6,510.00 $94 .00$ 5,828.0 092.52 $ 5,736.24 $ 95.00 $ 5,890.00 $ Pipe 18" HDPE 46.00 $ $ 35,236.00 $42 .00$ 32,172.0 035.95 $ 27,537.70 $ 95.00 $ 72,770.00 $ Pipe 18 "HDPE 18" exf 108 00 $108.00 $ 138 132 00 138,132.00 95 95 00 $.00 121 505 2,0.0 00 94 60 $123 295 60 $105 00 $134 295 00 $094.60 123,295.60 105.00 134,295.00 4" basin 2,286.00 $ $ 34,290.00 $2,000 .00$ 30,000.0 02,677.13 $ 40,156.95 $ 3,200.00 $ 48,000.00 $ 5' basin 2,860.00 $ $ 14,300.00 $2,350 .00$ 11,750.0 03,224.94 $ 16,124.70 $ 3,500.00 $ 17,500.00 $ 6' basin 3,490.00 $ $ 10,470.00 $3,025 .00$ 9,075.0 04,920.48 $ 14,761.44 $ 4,000.00 $ 12,000.00 $ 4'manhole 2,575.00 $ $ 7,725.00 $1,900 .00$ 5,700.0 03,165.95 $ 9,497.85 $ 3,500.00 $ 10,500.00 $ 5' manhole 2,670.00 $ $ 18,690.00 $2,350 .00$ 16,450.0 03,165.94 $ 22,161.58 $ 3,800.00 $ 26,600.00 $ 6'manhole 3,855.00 $ $ 3,855.00 $4,200 .00$ 4,200.0 05,978.20 $ 5,978.20 $ 4,200.00 $ 4,200.00 $ Baffle 215.00 $ $ 4,945.00 $435 .00$ 10,005.0 0312.76 $ 7,193.48 $ 500.00 $ 11,500.00 $ Invert baffle 240.00 $ $ 480.00 $506 .00$ 1,012.0 0319.06 $ 638.12 $ 800.00 $ 1,600.00 $ connect ext.d rain 750.00 $ $ 3,750.00 $1,200 .00$ 6,000.0 0952.41 $ 4,762.05 $ 350.00 $ 1,750.00 $ connect drain 1,500.00 $ $ 3,000.00 $1,325 .00$ 2,650.0 0797.94 $ 1,595.88 $ 500.00 $ 1,000.00 $ connect pipe topipe 1,185.00 $ $ 3,555.00 $800 .00$ 2,400.0 0705.88 $ 2,117.64 $ 300.00 $ 900.00 $ plug invert 400.00 $ $ 400.00 $750 .00$ 750.0 0411.76 $ 411.76 $ 400.00 $ 400.00 $ F&I pipe end c ap 250.00 $ $ 2,000.00 $750 .00$ 6,000.0 0525.80 $ 4,206.40 $ 200.00 $ 1,600.00 $ excavation roc k 46.00 $ $ 4,600.00 $73 .00$ 7,300.0 01.18 $ 118.00 $ 30.00 $ 3,000.00 $ F&P flowable fill 90.00 $ $ 9,000.00 $145 .00$ 14,500.0 01.18 $ 118.00 $ 125.00 $ 12,500.00 $ clean structur e 160.00 $ $ 800.00 $135 .00$ 675.0 088.24 $ 441.20 $ 300.00 $ 1,500.00 $ clean pipe 5.00 $ $ 1,375.00 $ 2.50$ 687.5 04.12 $ 1,133.00 $ 10.00 $ 2,750.00 $ Sub ‐Drainage $ 312,183.00 308,358.5 $ 0 27,805.82 $ 296,523.59 $ 388,355.00 $ Inc Hialeah Gardens, FL Metro Express, Inc. of Medley FL g ,$man $$5 45 $$$$$Paving 2' Valley gutte r 17.00 $ $ 5,831.00 $16 .00$ 5,488.0 018.07 $ 6,198.01 $ 15.00 $ 5,145.00 $ Type D curb 13.00 $ $ 7,709.00 $17 .00$ 10,081.0 011.18 $ 6,629.74 $ 10.00 $ 5,930.00 $ ITB#10 ‐11 ‐070 Livable Neighborhood Improvements Vista Verde ‐ Tabulation Sheet JVA Engineerin Miami FL g Contrator, Inc. of In Po tercounty Engineering In mpano Bch, FL c. of Acosta Tractors,cont.Unit Price Total Price U nit Price Total Pric e Unit PriceTotal Price Unit PriceTotal Price Type F curb 18.00 $ $ 2,340.00 $23 .00$ 2,990.0 019.68 $ 2,558.40 $ 18.00 $ 2,340.00 $ Mill 1"11.25 $ $ 14,085.00 $18 .00$ 22,536.0 016.47 $ 20,620.44 $ 12.00 $ 15,024.00 $ F&P 2" superp ave 16.20 $ $ 83,721.60 $19 .00$ 98,192.0 016.59 $ 85,737.12 $ 18.00 $ 93,024.00 $ F&P 8" limero ck 13.05 $ $ 67,442.40 $14 .00$ 72,604.0 08.38 $ 43,307.84 $ 15.00 $ 77,520.00 $ F&P 12" subgr ade 3.15 $ $ 16,279.20 $ 5.00$ 25,840.0 04.78 $ 24,703.04 $ 3.50 $ 18,088.00 $ F&P 6" sidewa lk 36.00 $ $ 11,988.00 $46 .00$ 15,318.0 038.24 $ 12,733.92 $ 45.00 $ 14,985.00 $ F&I truncated dome 55.00 $ $ 4,400.00 $20 .00$ 1,600.0 017.65 $ 1,412.00 $ 25.00 $ 2,000.00 $ R&D roadway 3.60 $ $ 18,604.80 $10 .00$ 51,680.0 04.75 $ 24,548.00 $ 9.00 $ 46,512.00 $ R&D valley gu y tter 4.00 $ $ 4,256.00 $, 6.50$ 6,916.0 04.12 $ 4,383.68 $ 2.00 $ 2,128.00 $ ,,R&D sidwalk 5.85 $ $ 1,948.05 $19 .50$ 6,493.5 017.47 $ 5,817.51 $ 9.00 $ 2,997.00 $ Aprons 500.00 $ $ 2,500.00 $890 .00$ 4,450.0 0377.65 $ 1,888.25 $ 600.00 $ 3,000.00 $ Sub ‐Paving $ 241,105.05 324,188.5 $ 0 525.78 $ 240,537.95 $ 288,693.00 $ Sign & Marking 24" white solid 5.00 $ $ 595.00 $ 6.00$ 714.0 07.41 $ 881.79 $ 3.00 $ 357.00 $ 6" double yell ow 2.00 $ $ 496.00 $ 4.50$ 1,116.0 03.29 $ 815.92 $ 2.00 $ 496.00 $ 6" white solid 1.00 $ $ 540.00 $ 1.15$ 621.0 01.18 $ 637.20 $ 1.00 $ 540.00 $ install signs 350.00 $ $ 3,500.00 $750 .00$ 7,500.0 0311.76 $ 3,117.60 $ 400.00 $ 4,000.00 $ Sub ‐Sign & Mar k $ 5,131.00 9,951.0 $ 0 5,452.51 $ 5,393.00 $ Miscellaneous F&I 8" sewer main 4,500.00 $ $ 22,500.00 $2,200 .00$ 11,000.0 05,146.91 $ 25,734.55 $ 900.00 $ 4,500.00 $ F&I 6" sewer lateral 2,000.00 $ $ 50,000.00 $600 .00$ 15,000.0 02,967.87 $ 74,196.75 $ 900.00 $ 22,500.00 $ F&I 6"lateral r eplace 3,500.00 $ $ 35,000.00 $850 .00$ 8,500.0 07,008.56 $ 70,085.60 $ 1,800.00 $ 18,000.00 $ R&D sewer pi pe 10.00 $ $ 11,000.00 $12 .00$ 13,200.0 06.41 $ 7,051.00 $ 3.00 $ 3,300.00 $ Power pole 1,800.00 $ $ 9,000.00 $1,355 .00$ 6,775.0 0294.12 $ 1,470.60 $ 1,000.00 $ 5,000.00 $ Adj st manhole A d just h o l e 400 00 $400.00 $ 10 000 00 10,000.00 $175 17 00 $.00 4 375 ,37.0 00 158 82 $3 970 50 $300 00 $7 500 00 $0158.82 3,970.50 300.00 7,500.00 Relocate mail box 175.00 $ $ 3,500.00 $185 .00$ 3,700.0 088.24 $ 1,764.80 $ 200.00 $ 4,000.00 $ Relocate fence 18.00 $ $ 1,800.00 $32 .00$ 3,200.0 011.76 $ 1,176.00 $ 10.00 $ 1,000.00 $ Clean & TV sys tem 17,085.00 $ $ 17,085.00 $14,000 .00$ 14,000.0 07,255.88 $ 7,255.88 $ 6,000.00 $ 6,000.00 $ Off ‐Duty Polic e 30,000.00 $ $ 30,000.00 $30,000 .00$ 30,000.0 030,000.00 $ 30,000.00 $ 30,000.00 $ 30,000.00 $ Sub ‐Misc.$ 189,885.00 109,750.0 $ 0 52,938.57 $ 222,705.68 $ 101,800.00 $ Grand Totals 773$ ,304.05 776,562.00 $ 812,572.67 $ 833,241.00 $