Loading...
HomeMy WebLinkAboutJ-3 Resolution: P.O. to GEC Associates, Inc.City of ~Vliami Gard~ens 1515-200 NW 167~' Street Miami Gardens, Florida 33169 Mayor Shirley Gibson Vice Mayor Oscar Braynon II Councilman Melvin L. Bratton Councilman Aaron Campbell Jr. Councilwoman Sharon Pritchett Councilwoman Barbara Watson Councilman Andr~ Williams Aaenda Cover Paae Date: July 11, 2007 Fiscal Impact: No ^ Yes X Public hearing ^ Quasi-Judicial ^ (If yes, explain in Staff Summary) Ordinance ^ Resolution X Funding Source: Building Bond 1st Reading ^ 2nd Reading o Contract/P.O. Requirement: Yes X No^ Advertising requirement: Yes o No X Sponsor Name/Department: RFP/RFQ/Bid #City of Miami Bid#04-05-048 Danny Crew, City Manager Title A resolution of the City Council of the City of Miami Gardens, Florida, authorizing the City Manager to issue a purchase order in the amount of $162,938.90 to GEC Associates, Inc., in accordance with the City of Miami's JOC contract for renovations to portions of the new Police Department facility; providing for adoptions of representations; providing an effective date. Staff Summa On April 11, 2007, City Council authorized the purchase of property to house the Police Department and all services related to the operation of that department. The previous owners of the property operated a telecommunications company whose office configuration is not fully conducive to all the functions required for a police department. Staff contacted one of our contracted Architectural firms to inquire as to an estimated time frame and cost to provide design and construction documents to renovate. The time frame for full design and build-out by the Architect compromised our timeline of partially occupying the building by July 10, 2007 to start training and network development. In order to expedite usage of the building, we divided the scope of work into two sections. The first was the light office renovations in areas that were needed immediately and the second was for the portions of the building which would not be required until December 1, 2007, (i.e. interview rooms, sallie port, holding area, locker and shower areas etc.). We directed the architectural firm to provide the design and construction documents for the portions needed in December 2007 and agreed to work with a separate general contracting firm to complete light office renovations in the areas required immediately. We determined that this approach would eliminate the need to lease space, recognize a cost savings, and ensure timely project implementation. J-3) CONSENT AGENDA RESOLUTION GEC ASSOCIATES, INC. Analysis: The City of Miami issued a bid for Job Order Contracts (JOC) and awarded to general contractors for vertical construction & renovation and horizontal construction & renovation. The award is based on qualifications, experience, and the adjustment factor or cost. The terms and conditions of this contract allow other governmental municipalities to utilize it. The JOC contract requires the contractor to furnish all services such as shop drawings, samples, materials, transportation, supervision, labor and equipment needed to perform the work designated by the City. This contract (Exhibit 1) was awarded in April 2005 for an initial term of 24 months with three additional twelve month renewals. Each renewal allows for an economic price adjustment measured by the Construction Cost Index (CCI). The contract is currently in the first renewal. The current adjustment factor for GEC Associates, Inc. is 1.0852. Julie-Ann, Assistant to the Mayor and Council, has a copy of the City of Miami Job Order Contract for your review. Staff contacted the first awarded contractor, GEC Associates, Inc. located in Doral, Florida to provide us with a quotation per the terms and conditions of the JOC contract to renovate the areas of the building that will be occupied first (i.e. training room, restrooms, computer area, etc.) GEC Associates, Inc. provided a quotation (Exhibit 2) to renovate the areas of the building that would be needed immediately, including the records room, bathrooms, eliminate and add doors, eliminate and add walls, and renovate the kitchen area for a total amount of $162,938.90. Funding for the renovation is available from the building bond. Recommendation: We recommend that the City Council approve the attached resolution authorizing the City Manager to issue a purchase order in accordance with the City of Miami's JOC contract to GEC Associates, Inc. in the amount of $162,938.90 for the renovations of the police building. RESOLUTION No. 2007- A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF MIAMI GARDENS, FLORIDA, AUTHORIZING THE CITY MANAGER TO ISSUE A PURCHASE ORDER IN THE AMOUNT OF $162,938.90 TO GEC ASSOCIATES, INC., IN ACCORDANCE WITH THE CITY OF MIAMI'S JOC CONTRACT FOR RENOVATIONS TO PORTIONS OF THE NEW POLICE DEPARTMENT FACILITY; PROVIDING FOR THE ADOPTION OF REPRESENTATIONS; PROVIDING AN EFFECTIVE DATE. 1 WHEREAS, the City has recently purchased an improved property for the 2 purpose of establishing a police force facility, and 3 WHEREAS, the City staff has provided for a phased-improvement program, 4 including both design and build-out, and 5 WHEREAS, it is appropriate to complete light office renovations in areas which 6 will facilitate the orderly and timely commencement of police operations, and thereby 7 eliminate the need to lease space, achieve cost-savings and ensure timely project 8 implementation, and 9 WHEREAS, the City of Miami issued a bid for Job Order Contracts ("JOC") and 10 awarded contract opportunities to various general contractors for vertical construction 11 and renovation and horizontal construction and renovation, and 12 WHEREAS, such awards are based upon qualifications, experience and the 13 adjustment factor for cost, and 14 WHEREAS, the City of Miami JOC contemplates co-municipal utilization, and 15 WHEREAS, based upon the terms of the JOC Contact, the cost of the project, 16 awarded to GEC Associates, Inc., located in Doral, Florida, will be $162,938.90 for the 17 renovations of the building, according to the design therefor prepared, 18 NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY 19 OF MIAMI GARDENS, FLORIDA, AS FOLLOWS: 20 Section 1. ADOPTION OF REPRESENTATIONS: The foregoing Whereas 21 paragraphs are hereby ratified and confirmed as being true, and the same are hereby 22 made a specific part of this Resolution. 23 Section 2. AUTHORIZATION: The City Council of the City of Miami Gardens, 24 Florida, authorizes the City Manager to issue a purchase order in the amount of 25 $162,938.90 to GEC Associates, Inc., for renovations to portions of the new Police 26 Department facility, in accordance with the City of Miami's JOC Contract. 27 Section 3. EFFECTIVE DATE: This Resolution shall take effect immediately 28 upon its final passage. 29 PASSED AND ADOPTED BY THE CITY COUNCIL OF THE CITY OF MIAMI 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 GARDENS AT ITS REGULAR MEETING HELD ON JULY 11, 2007. SHIRLEY GIBSON, MAYOR ATTEST: RONETTA TAYLOR, CMC, CITY CLERK Prepared by JAMES C. BRADY, ESQ. Assistant City Attorney SPONSORED BY: DR. DANNY O. CREW, CITY MANAGER MOVED BY: 51 52 53 54 55 56 57 58 59 60 61 VOTE: Mayor Shirley Gibson (Yes) (No) Vice Mayor Oscar Braynon, II (Yes) (No) Councilman Melvin L. Bratton (Yes) (No) Councilman Aaron Campbell (Yes) (No) Councilman Andre Williams (Yes) (No) Councilwoman Sharon Pritchett (Yes) (No) Councilwoman Barbara Watson (Yes) (No) JCB/teh 261748_1. DOC 62 ,~;~~~ er.FNDA IT M SU ~•__ ,.~, , 1~~~ .. t~~, _ 0~ Q~, ; ~ FILE ID• ~.~r~ .. - Date: 4/28I~ Requesting Department: Capital Imnrovts &'i'ransport Commission Meeting Date: 5/12/2005 District Impacted: A11 Type: ~ Resolution ^ Ordinance ^ Emergency Ordinance ^ Discussion Iiem ^ Other Subject: Award of Bid to multi le contractors for Cit of Miami Iob Order Contracts authorization to execute contracts Purpose of Item: To award sixteen (lb) contracts, eight (8) for horizontal construction and eight (8) for vertical construction, for the implementation of various capital improvement projects throughout the City, and to authorize the Ciry Manager to execute agreements with each of the awarded contractors - - - _ ~-----•--_. contractors tor specu~~ p~~~~~•~ ~• ,~~~ ~--..--- ---- . drawings. The Capital Improvement & Transportation Department has documented the continued n for timely and cost effectively procurement of maintenance and constivction services for capital projects, particularly for the expenditure of Homeland Defense Neighborhood Tmprovement Boncl proceeds, first series. The Administration issued Bid No. 04-OS-048 on Apriof-wa O~ onostru ti n,~~ ~ Miami J O C c o n t r a c t s f o r b o t h v e r t i c a l ( buildin g) and horizontai {righ - y) twenty-twa (22) responssve bids were received on April 13, 2005. The City Manager and the Director of the Department of Capital Improvcraents and Transportation recommend that contracts be awarded to and executed with thc sixteen (16) lowest responsive and responsible bidders to be utilized for various capital projects. A form agreement is attached that details the terms and conditions of each JOC contract, which have a term of 12 ears c r or a specified maximum value, w h ic hever is reached earliest. The maximum term is five (5} y 5 times the specified value, again, which~ver is reached earliest. Award at this time is rccommended at 24 months or 2 times the specified value. Bud et Im act Ana ai NO Is this item related to revenue7 ~ease ident' funding sowrce below. YES Is thia item an expenditare? If so, p ~Y General Account No: Special Revenue Account No: ' CIP Project No: Various Paow 1 nf 2 YES Is this item funded by Nomeland Defcnse/Neighborhood Improvement Boads? Start Up Capitai Cost: Maintenance Cost: Total Fiscal Impact: ~ Final Anarovals _ f~~ ,~~ ~IGN - CIP ~ If using or iving cspital funds City Manager Page 2 of 2 : ;~,~.,yl. ~':. i /,~r4`~ 1/.1 , Proposal - Category Summary Submitted By: GEC Associates, !nc 9487 NW 12 St Miami, FI 33172 JOC Master Coniract: 04-05-048A Project Duralion: CdST 6REAKDOWN !bv Cateqorv Sectionl Tmal Category - 01 Miscellaneous 3,099.73 Category - 01 Room 105 2,360.95 Category - 02 Record Room 1,1 i5.90 Category - 03 Create Roam 146 1,528.51 Category - 04 Renovate Bathrooms 956 & 157 60,321.53 Category - 05 Etiminate Door and Add Wall 201.63 Category - O6 Sawcut Opening and Add Door 2,329.68 Categary • 07 Renovate Kitchen 9,653.14 Category - OB Renovate Bathroom 166 5,451.45 Category - 09 Add walf between 124 ~ 123 1,744.60 Category - 90 Renovate Bathrooms 113 & 114 11,351,25 Category - 17 Renovate Kitchen 1 f2 11,815.02 Category -12 Change Exterior poors 40,675.DT Category -13 Additional Batbrooms 14,290.44 Job Order Proposai Total 162,938.90 Thfs work order proposal total reptesents Ihe corted total far the proposal Any disrnepancy belween Iine lotals sub-totals and the proposaE total is due lo rounding af the Iina lolals and su6-totals Proposal Checklist ~ Detaled Cost Proposal ~ Non-Prepriced Backup o Computer DisklElectroniealiy ~ Drawings/Submiltats ~ Construclion Schedute Q 5ubcontract PlanlSelf Pe~formance Date June 22. 2067 Page t of 1