HomeMy WebLinkAbout2020-034-3433 A&P Consulting RFQ 18-19-008 RESOLUTION NO. 2020-034-3433
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
MIAMI GARDENS, FLORIDA, APPROVING THE
PROPOSAL AND WORK ORDER SUBMITTED BY A&P
CONSULTING TRANSPORTATION ENGINEERS CORP,
PURSUANT TO CONTINUING ARCHITECTURAL AND
ENGINEERING SERVICES REQUEST FOR
QUALIFICATIONS (RFQ) NO. 18-19-008, FOR DESIGN
SERVICES FOR THE MARCO CANAL CULVERT
HEADWALLS REPLACEMENT PROJECT IN AN AMOUNT
NOT TO EXCEED ONE HUNDRED AND TWENTY-EIGHT
THOUSAND AND SEVEN HUNDRED AND EIGHTEEN
DOLLARS AND NINETEEN CENTS ($128,718.19);
PROVIDING FOR THE ADOPTION OF
REPRESENTATIONS, PROVIDING FOR AN EFFECTIVE
DATE.
WHEREAS, the City of Miami Gardens ("City") maintains five (5) culverts that
direct stormwater from various catchments areas in the Scott Lake Subdivision, under
City Streets, into a series of connected waterbodies collectively known as Marco Canal,
before eventually discharging into Biscayne Bay, and
WHEREAS, these culverts, located at NW 17th Avenue, NW 18th Avenue, NW
19th Avenue, NW 20th Avenue and NW 171th Street, constructed more than forty years
ago, appear to have failed at several locations and their headwalls are severely cracked
and showing signs of failure due to settlement and bank erosion, and
WHEREAS, the services of A&P Consulting Transportation Engineers Corp.
have been solicited under the City's Continuing Architectural and Engineering Services
RFQ #18-19-008, for the design of replacement headwalls at all five (5) culvert pipe
locations, inspection and replacement or repair of damaged culvert pipes where
deemed necessary, and canal embankment erosion mitigation, and
WHEREAS, City Staff recommends that the City Council approves the proposal
and work order submitted by A&P Consulting Transportation Engineers Corp. in the
RESOLUTION NO 2020-034-3433
amount of One Hundred and Twenty-Eight Thousand and Seven Hundred and Eighteen
Dollars and Nineteen Cents ($128,718.19) for the provision of design, inspection,
survey and permitting services for the Marco Canal Culvert Headwalls Replacement
Project,
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF MIAMI GARDENS, FLORIDA AS FOLLOWS:
Section 1: ADOPTION OF REPRESENTATIONS: The foregoing Whereas
paragraphs are hereby ratified and confirmed as being true, and the same are hereby
made a specific part of this Resolution.
Section 2: AUTHORIZATION: The City Council of the City of Miami Gardens
hereby approves the proposal and work order submitted by A&P Consulting
Transportation Engineers Corp, pursuant to Continuing Architectual and Engineering
Services RFQ #18-19-008, for design services for the Marco Canal Culvert Headwalls
Replacement Project In an amount not to exceed One Hundred and Twenty-Eight
Thousand and Seven Hundred and Eighteen Dollars and Nineteen Cents
($128,718.19).
Section 3: EFFECTIVE DATE: This Resolution shall take effect immediately
upon its final passage.
PASSED AND ADOPTED BY THE CITY COUNCIL OF THE CITY OF MIAMI
GARDENS AT ITS REGULAR MEETING HELD ON MARH 11, 2020.
Page 2 of 4
RESOLUTION NO 2020-034-3433
PREPARED BY: SONJA KNIGHTON DICKENS, CITY ATTORNEY
SPONSORED BY: CAMERON D. BENSON, CITY MANAGER
Moved by: Councilman David Williams Jr
Seconded by: Vice Mayor Rodney Harris
VOTE: 7-0
Mayor Oliver Gilbert, III X (Yes) (No)
Vice Mayor Rodney Harris X (Yes) (No)
Councilwoman Katrina Wilson X (Yes) (No)
Councilman Erhabor Ighodaro, Ph.D. X (Yes) (No)
Councilwoman Lillie Q. Odom X (Yes) (No)
Councilman Reggie Leon X (Yes) (No)
Councilman David Williams Jr X (Yes) (No)
Page 3 of 4
RESOLUTION NO 2020-034-3433
-d= 4�('
OLIVER GILBERT, III, MAYOR
ATTEST:
q� (� �LA
MARIO BATAILLE, CMC, CITY CLERK
Page 4 of 4
RESOLUTION NO. 2020-034-3433