Loading...
HomeMy WebLinkAbout2020-034-3433 A&P Consulting RFQ 18-19-008 RESOLUTION NO. 2020-034-3433 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF MIAMI GARDENS, FLORIDA, APPROVING THE PROPOSAL AND WORK ORDER SUBMITTED BY A&P CONSULTING TRANSPORTATION ENGINEERS CORP, PURSUANT TO CONTINUING ARCHITECTURAL AND ENGINEERING SERVICES REQUEST FOR QUALIFICATIONS (RFQ) NO. 18-19-008, FOR DESIGN SERVICES FOR THE MARCO CANAL CULVERT HEADWALLS REPLACEMENT PROJECT IN AN AMOUNT NOT TO EXCEED ONE HUNDRED AND TWENTY-EIGHT THOUSAND AND SEVEN HUNDRED AND EIGHTEEN DOLLARS AND NINETEEN CENTS ($128,718.19); PROVIDING FOR THE ADOPTION OF REPRESENTATIONS, PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, the City of Miami Gardens ("City") maintains five (5) culverts that direct stormwater from various catchments areas in the Scott Lake Subdivision, under City Streets, into a series of connected waterbodies collectively known as Marco Canal, before eventually discharging into Biscayne Bay, and WHEREAS, these culverts, located at NW 17th Avenue, NW 18th Avenue, NW 19th Avenue, NW 20th Avenue and NW 171th Street, constructed more than forty years ago, appear to have failed at several locations and their headwalls are severely cracked and showing signs of failure due to settlement and bank erosion, and WHEREAS, the services of A&P Consulting Transportation Engineers Corp. have been solicited under the City's Continuing Architectural and Engineering Services RFQ #18-19-008, for the design of replacement headwalls at all five (5) culvert pipe locations, inspection and replacement or repair of damaged culvert pipes where deemed necessary, and canal embankment erosion mitigation, and WHEREAS, City Staff recommends that the City Council approves the proposal and work order submitted by A&P Consulting Transportation Engineers Corp. in the RESOLUTION NO 2020-034-3433 amount of One Hundred and Twenty-Eight Thousand and Seven Hundred and Eighteen Dollars and Nineteen Cents ($128,718.19) for the provision of design, inspection, survey and permitting services for the Marco Canal Culvert Headwalls Replacement Project, NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF MIAMI GARDENS, FLORIDA AS FOLLOWS: Section 1: ADOPTION OF REPRESENTATIONS: The foregoing Whereas paragraphs are hereby ratified and confirmed as being true, and the same are hereby made a specific part of this Resolution. Section 2: AUTHORIZATION: The City Council of the City of Miami Gardens hereby approves the proposal and work order submitted by A&P Consulting Transportation Engineers Corp, pursuant to Continuing Architectual and Engineering Services RFQ #18-19-008, for design services for the Marco Canal Culvert Headwalls Replacement Project In an amount not to exceed One Hundred and Twenty-Eight Thousand and Seven Hundred and Eighteen Dollars and Nineteen Cents ($128,718.19). Section 3: EFFECTIVE DATE: This Resolution shall take effect immediately upon its final passage. PASSED AND ADOPTED BY THE CITY COUNCIL OF THE CITY OF MIAMI GARDENS AT ITS REGULAR MEETING HELD ON MARH 11, 2020. Page 2 of 4 RESOLUTION NO 2020-034-3433 PREPARED BY: SONJA KNIGHTON DICKENS, CITY ATTORNEY SPONSORED BY: CAMERON D. BENSON, CITY MANAGER Moved by: Councilman David Williams Jr Seconded by: Vice Mayor Rodney Harris VOTE: 7-0 Mayor Oliver Gilbert, III X (Yes) (No) Vice Mayor Rodney Harris X (Yes) (No) Councilwoman Katrina Wilson X (Yes) (No) Councilman Erhabor Ighodaro, Ph.D. X (Yes) (No) Councilwoman Lillie Q. Odom X (Yes) (No) Councilman Reggie Leon X (Yes) (No) Councilman David Williams Jr X (Yes) (No) Page 3 of 4 RESOLUTION NO 2020-034-3433 -d= 4�(' OLIVER GILBERT, III, MAYOR ATTEST: q� (� �LA MARIO BATAILLE, CMC, CITY CLERK Page 4 of 4 RESOLUTION NO. 2020-034-3433